Monthly Archives: August 2012

Reconciling Layers in Civil 3D

A message usually appears when the Layer Evaluation/Notification is turned on and there are new layers that are waiting to be reconciled.  What this means is that there are new layers and you can use this as a look-ahead that … Continue reading

Posted in Civil 3D Drafting, Civil Engineering | Leave a comment

Utility Drafting for SC Edison – Interpreting OH and UG as-built Plans

-Underground utilities end with a “0” or a “5” -Also, if there is an OC/LA County Number, it is underground if the plan number does not end with a letter (either A, B, C, or D). Example: LA CO. 34-65 … Continue reading

Posted in Civil Engineering | Leave a comment

Reviewing the Curb Ramps for Torrance Area C

I had many scenarios where curb ramps were drawn in different than the case and type that were called out. For instance, on sheet 11, there is a curb ramp called out to be case B type 2 with a … Continue reading

Posted in Civil Engineering, Uncategorized | Leave a comment

Attde

It is everything:health, leads to control & happiness.  The more you fight with facts & rational, the more poz attitude muscle you’ll build.  It sets the stage for -> choices -> the better choices you make, the better quality of … Continue reading

Posted in Attitude | Leave a comment